Purchase price is only part of a parts washer’s cost. A useful comparison also includes cleaning fluid, filters, electricity, maintenance time and waste handling. Compare systems against the same workload using your workshop’s invoices and measured usage rather than assuming a fixed saving.
What to Include in the Running Cost
For your current washer, record fluid purchases and change-outs, waste collection charges, servicing and the time spent cleaning and maintaining the system. Include electricity where applicable. Waste-handling costs and requirements depend on the fluid, contaminants and local arrangements, so check your actual disposal requirements rather than assuming every workshop has the same costs.
How ROwasher Changes the Cost Breakdown
ROwasher combines water-based cleaning fluid with microbes that break down oil and grease, helping extend the fluid’s working life. Routine maintenance includes replacing the microbial filter mat monthly and topping up with ROwash solution when the low-fluid indicator shows.
Budget for filters, fluid top-ups, electricity and maintenance. Bioremediation does not remove the need to manage accumulated sludge, used filters or spent fluid appropriately. Follow the maintenance guidance and assess fluid condition rather than assuming it never needs replacing.
Estimate Payback for Your Workshop
Compare the full delivered cost of the equipment with the difference between your current and expected running costs. If the new system costs less to run, divide the additional upfront cost by the estimated monthly saving to calculate an indicative payback period. Include your workload, fluid consumption, electricity tariff and waste-handling costs. Time saved can add value, but it is not automatically a cash saving. There is no single payback period that applies to every workshop.
For help estimating consumable requirements, tell us about the parts you clean, your workload and your current cleaning process.